Duct bank under Mabry medical pad
CO deadline — vault-to-vault bore under parking while primary feed reaches switchgear.
Clovis, NM · Curry County
Electric conduit boring between Clovis vaults — duct banks under TI schedules when Xcel corridors and asphalt cuts would miss CO dates.
Electric conduit boring in Clovis links manholes, pads, and switchgear with underground ducts — keeping feeds off the surface until cable pulls are scheduled. Mabry medical and retail TI uses HDD to connect vaults without repeated asphalt removals.
Xcel Energy locates are treated as live until potholes prove otherwise — shallow secondary crowds Main Street ROW. Multi-duct pulls are engineered for cable tension and bend radius.
Directional boring for electric often pairs with fiber on the same TI — separate ducts, same path when spec allows.
Real Curry County angles — not generic statewide copy.
CO deadline — vault-to-vault bore under parking while primary feed reaches switchgear.
Congested shallow ROW — pothole program before pits; compact rig between handholes.
Longer shot with NMDOT MOT and utility clearance — pull tension for future cable.
Parallel ducts per engineer separation rules for uptime.
Clovis electric bores scope vault spacing and duct count — then 811 and Xcel locates. HDD pulls ducts on grade; tension and bend radius logged. Encasement follows where city detail requires.
Curry County Llano Estacado fringe carries sandy loam, caliche hardpan, and shallow clay — flat agricultural fill and rail-yard grading debris change mud programs field to field.
Clovis bores encounter sandy loam and caliche hardpan between 2 and 8 feet on flat High Plains parcels — shallower than mesa markets elsewhere in New Mexico. BNSF rail-yard-adjacent fill can hide cobbles and debris lenses that stall reaming without test pits. Irrigation-saturated dairy and wheat parcels raise buoyancy risk on longer HDPE pulls through soft topsoil. We do not assume Roswell gypsum or Albuquerque caliche models apply on the Llano Estacado fringe.
High Plains wind, cold winters, and summer monsoons drive Clovis bore schedules — dust storms and irrigation-season groundwater on flat farmland are built into quotes.
Winter cold and High Plains wind slow morning startup on exposed US-60 pads from November through March. Irrigation season from April through October raises shallow groundwater on agricultural-adjacent bores. Summer monsoons soften flat farmland ROW from July through September — entry pit work may wait for dry windows. We schedule around known patterns instead of forcing bores into saturated dairy parcels after heavy rain.
City of Clovis Community Development, Curry County ROW, NMDOT District 2 on US-60 and US-70, Cannon AFB coordination on adjacent parcels, and Xcel Energy agreements apply on many alignments.
City of Clovis Community Development governs street cuts, driveway removals, and drainage work along municipal ROW. Curry County rules apply on unincorporated parcels toward Texico and the agricultural fringe. NMDOT District 2 controls US-60, US-70, and state highway bores — MOT plans are common on Mabry Drive frontage. BNSF agreements govern mainline and yard crossings — flagging and inspection often set critical path. Cannon AFB coordination may apply on parcels near base boundaries.
Repeated asphalt cuts burn TI schedules — boring links vaults with fewer full-width removals.
Duct count, vault spacing, asphalt restoration, traffic control, inspection time.
You share plans or describe the problem; we confirm alignment, depth, access, and which trenchless method fits New Mexico soils.
New Mexico 811 ticket filed; two business days minimum before pits open unless your permit path differs. We pothole where marks conflict.
Bore plan, NMDOT or city ROW permits, railroad agreements, and crossing engineering when the path leaves private property.
Compact spread for tight Santa Fe lots; larger HDD for I-25 or I-40 relocations — matched to length and diameter.
Steered pilot on design line, ream passes sized for your pipe or casing, fluid program tuned for caliche or adobe clay.
HDPE fusion, steel casing, or multi-duct bundle pulled with tension and bend-radius monitoring.
Pressure test, mandrel, or survey records for owners, inspectors, and operators as spec requires.
Compact pits, replace gravel or hardscape per scope, leave 811 ticket and locate map in your project file.
Duct count, vault spacing, restoration, and traffic control drive price. Send vault plan for quote.
Conduit placement is our scope; cable pulls are typically a separate trade.
Only with approved clearances and sometimes outage windows.
Engineered per OD and reamed diameter — no overload pulls.
24/7 — Emergency dispatch statewide. Tell us entry, exit, pipe size, and county — a bore specialist calls back with cost drivers, not a flat rate.
Scope your alignment
Step 1 of 2 — path, pipe, and city first